Commit Graph
2 Commits
Author SHA1 Message Date
MichilisandClaude Opus 5 5dc284c5f2 phase-4: the live tax position, deadlines and the notifications behind them
The dashboard, the deadline engine, the three sweeps and the notification
channels. Confirm a comprobante and the IVA and IRP figures move; every
headline number opens the documents behind it.

The dashboard does no arithmetic of its own: it picks inputs and calls
packages/rules. The acceptance test asserts the API's numbers equal what
computeF120 and computeF515 produce over the same rows, before and after the
bandeja is confirmed, so a drift in either direction fails.

Deadlines come from the calendario perpetuo, skipping any period earlier than
the date the taxpayer took the obligation on. Without that guard a brand new
account opens on a red overdue card for a period that predates it.

Sweeps are idempotent by dedupe key rather than bookkeeping: a restarted
poller, a second replica and a crash mid-sweep all converge on one run, and one
reminder per user per period per milestone. They queue notifications rather
than sending them, so a channel being down retries on the job schedule. The
T-10 test derives the date from dueDateFor rather than restating the calendar.

Auto-confirm only touches what the rules were confident about and never a
decision the user already made. An unconfigured channel is absent rather than
broken: the fan-out skips it, the UI hides it, and a frozen account receives
nothing.

Web: the dashboard's three zones with swipeable position cards and traceable
numbers, the deadlines timeline, and the app shell with the tab bar and the
persistent scan button FLOWS.md asks for.

Two additions to the specs, both marked: hasDocuments on DashboardDto, without
which a position of all zeros is indistinguishable from a real one and the
first-run state never shows; and an insight_dismissals table, which FLOWS.md
requires and SPEC.md has nowhere to put.

Also: pnpm db:reset, because the e2e suite changes the seed it runs against and
a suite that is not repeatable is not a suite.

280 vitest tests, 51 Playwright tests, rules coverage still 100%, typecheck and
lint clean.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-04 04:42:32 +00:00
MichilisandClaude Opus 5 0d7651b17c phase-2: identity, from the landing hook to the profile screen
Flows A1 to A6 and E3 end to end. A visitor types a RUC on the landing page,
sees their real filing dates, registers, verifies a six digit code, grants
consent, completes a three step setup and lands on the first run screen, with
the profile, consent and audit rows to show for it.

API: public RUC lookup behind a token bucket (10/min/IP), the full /me surface
(profile, dependents, consents, notification prefs, data export, account
deletion), an append-only audit module that exports an insert and nothing else,
and a PII module that is the only thing allowed near those tables.

Deletion and consent revocation both freeze the account and drop every session,
reusing better-auth's ban flag rather than adding a second notion of disabled.
Nothing is destroyed yet: the purge is a job for phase 4. deadlineDigit is
always derived server side, never accepted from the client.

Web: landing with the RUC hook, registration, OTP verification, consent, the
setup wizard, the profile screen with "Tus datos", and legal pages that ship as
marked placeholders per COPY.md section 13. Money, Skeleton, Switch and
EmptyState components added.

The seed is now complete for identity: Maria at 4123456-1, filing digit 6 and
day 19, with a dependant, consents and prefs; Carlos as an IVA-only company.

Two real defects found by building the screens and fixed with tests:
the OTP boxes dropped a digit because the handler fired effects inside a
setState updater that React 19 invokes twice, and the switch knob rendered
outside its track because translate-x-5.5 does not resolve.

232 vitest tests, 26 Playwright tests across mobile and desktop, coverage still
100% on the rules, typecheck and lint clean.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-03 23:33:10 +00:00